ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_114-e / Inbox / Drafts / [Offline-004][NR15] Connection Control I (Huawei) / Phase 2 CRs / Connection resume abortion CRs

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon 36331_CRXXXX_(Rel-15)_R2-210xxxx Clarification on the abortion of RRC connection resume.doc 2021/05/26 10:10 130,5 KB
icon 36331_CRXXXX_(Rel-16)_R2-210xxxx Clarification on the abortion of RRC connection resume.doc 2021/05/26 10:10 135 KB
icon 38331_CR2566_rev2_(Rel-15)_R2-210xxxx Clarification on the abortion of RRC connection resume.doc 2021/05/26 10:10 116,5 KB
icon 38331_CR2567_rev2_(Rel-16)_R2-210xxxx Clarification on the abortion of RRC connection resume.doc 2021/05/26 10:10 132,5 KB

4 items.